MADHYA PRADESH POORV KSHETRA VIDYUT VITARAN CO. LTD.

[ Log In ]
Group Circle From To Interruption than Minuts

Intrruption/Break Down Report for Dated 02 Mar 2026
Total Breakdown 1 Nos. (More Than 5 Minuts)

Detailed Report
(Highlighted Feeder Switched ON Next Day)
ssidCircleS/S NameFeeder NameGroupMETERIDDateOff_timeOn_timeCur_MWOff DurationTotal Off DurationSupply Hours
13NARSINGHPUR132KV BARMAN33KV PALOHAIIISPMPE2223602 Mar 2609:03:0009:11:000.03200:08:0000:08:0010:20:00


Feeder OFF status is evaluated by comparing Load with .03MW(Energy Meter with Higher Creeping)